:rant: :rant: :rant: [SIZE=14pt]RIGHT JUST HAD SOMEONE OUT TO CHECK THE DAMAGE YET AGAIN FROM THE LEAK,[/SIZE]YES IT WAS NEGLECT FROM THE LAST CONTRACTORS :angry:
KITCHEN CEILING WILL HAVE TO HAVE THE NEW PLASTER FROM THE LAST LEAK TAKEN OUT REDONE [SIZE=14pt] AS THERE IS A RIDGE THERE NOW[/SIZE] AND THEN REPAPERED BATH TAKEN OUT REFITTED
[SIZE=14pt]JUST WHAT I NEED[/SIZE]
[SIZE=14pt]RANT OVER[/SIZE]
KITCHEN CEILING WILL HAVE TO HAVE THE NEW PLASTER FROM THE LAST LEAK TAKEN OUT REDONE [SIZE=14pt] AS THERE IS A RIDGE THERE NOW[/SIZE] AND THEN REPAPERED BATH TAKEN OUT REFITTED
[SIZE=14pt]JUST WHAT I NEED[/SIZE]
[SIZE=14pt]RANT OVER[/SIZE]